Categories | Twin Screw Extruder |
---|---|
Brand Name: | Yanwei |
Model Number: | SHJ-95 |
Place of Origin: | China |
MOQ: | 1 set |
Payment Terms: | T/T, L/C |
Delivery Time: | 35-40 working days |
Packaging Details: | exporting wooden packing |
Output: | 1000-2500kg/h |
Twin screw host screw diameter: | 93mm |
Ratio: | L/D=36-60 |
Voltage: | 220V/410V/230V/405V/380V/415V/440V/Customized |
Plastic Processed: | PE, PP, ABS, PA, PET, PC, HDPE, ABS/PP, HDPE/PP, PE/PP, Lldpe |
Port: | Shanghai,China |
Supply Ability: | 15 Set/Sets per Month |
Lead time (days): | 35-40 |
Packing: | plastic film package/wooden |
RPM: | 400-800 |
Motor power: | 250-400 kw |
Application: | Luggage/PP/HDPE/LDP |
SHJ-95 Twin Extruder
Parameters: screw
outer diameter 93mm;
groove depth 16mm;
center distance 78mm
Main motor: 250-400kw;
L/D=36-60;
speed 400-800
Output 1000-2500kg/h (depending on the production materials and
process)
Large-scale production unit, suitable for blending modification,
filling modification, reaction extrusion and various functional
masterbatch production
The aspect ratio and pelletizing method can be adjusted according
to the operating materials and processes
Applicable Industries:
Hotels, Garment Shops, Building Material Shops, Manufacturing
Plant, Machinery Repair Shops, Food & Beverage Factory, Farms,
Restaurant, Home Use, Retail, Food Shop, Printing Shops,
Construction works , Energy & Mining, Food & Beverage Shops,
Advertising Company
Electrical Standard:
The standard is electrically manufactured according to the
JB/5420-2001 "Co-rotating Twin Screw Plastic Extruder" of the
Ministry of Machinery of China.with CE standards.
Samples:
Maximum order quantity: 1 set
Product Detail:
Packing:
FAQ:
● We are original manufacturer.
● If you interested in our products welcome to visit our Factory.
●We can send you engineers and make sure the high efficiency
after-sales service if you need.
●We quipped with a variety of professional processing equipment and
we have accumulated professional processing methods over the past
years.
● Each component before assembly needs strictly controlled by
inspecting department.
● Each assembly is in charge by a master who has working experience
for more than 15 years
● After all the equipment finished, we connect all the machines and
run the full production line for at least 12 hours to ensure the
stable running in customers' factory.
● Engineers, sales managers, and after-sales service managers will
form an after-sales team, online and offline, to follow the
customers' project.
![]() |