Categories | Galvanized Steel Pole |
---|---|
Brand Name: | JSBS |
Model Number: | BS-40 |
Certification: | ISO9001:2008 |
Place of Origin: | China |
MOQ: | 1pcs |
Price: | Negotiation |
Payment Terms: | L/C, T/T, D/P |
Supply Ability: | 2000 Ton per month |
Delivery Time: | 15 - 25 working days |
Packaging Details: | Pack the poles with sack or straw or wood or steel strap, etc |
Material: | Steel Q345 |
Shape: | Octagonal |
Tolerance: | +-2% |
Min Yield Stress: | 345Mpa |
Tensile Strength: | 470 Mpa ~ 630 Mpa |
Finishing: | Hot dip galvanized over 86mm |
Galvanized: | ASTM A123 |
Welding: | AWS D1.1 |
Length: | 30FT 40FT |
30FT 40FT Octagon Shape Galvanized Electric Steel Pole Philippines Electricity Transmission Line
Specifications:
Steel Pole of National Electrification Administration
PHILIPPINES)
Specification for Distribution Steel Pole 25FT, 30FT, 35FT,
40FT,45FT.
Height (ft) | Thickness (mm) | Butt Diameter (mm) | Top Diameter (mm) | Design Load (kg) | Yield Stress (MPA) | Zinc Coating (microns) |
25 | 2.5 | 152 | 120 | 300 | 345 | 86 |
30 | 3.0 | 226 | 127 | 500 | 345 | 86 |
35 | 3.0 | 248 | 127 | 500 | 345 | 86 |
40 | 3.0 | 317 | 127 | 500 | 345 | 86 |
45 | 4.0 | 328 | 127 | 750 | 345 | 86 |
Production Process
Description
JSBS has passed the ISO 9001 quality management system. And we have
our own Lab to do the chemical and mechanical test. For example, we
test the raw material component content and the strength when we
purchase the raw material. And if the material does not pass the
test,we’ll not use it to produce our poles. So customers can be
rest assured that we always manufacture the good quality poles.
Meanwhile, our factory has the AMT ( Advanced Manufacturing
Technology ), all the purposes are to provide high-quality poles to
all over the world.
We will test the metal sheet thickness, galvanization Thickness and
do the load test according to client's request before delivery.
This ensures the quality of the steel poles we produce.
Our factory has built special plant for testing the load of steel
poles.
Terms and Conditions
1. Price Term: EXW, FOB, CFR or CIF.
Ø EXW: Poles Cost
Ø FOB : Pole Cost + Land Transportation + Fee on Port
Ø CFR : Pole Cost + Land Transportation + Fee on Port + Sea Freight
Ø C I F : Pole Cost + Land Transportation + Fee on Port + Sea
Freight + Insurance.
2. MOQ: One 40FT Container.
3. Payment Term: Typically 30% by T/T as a deposit, balance by T/T
or L/C at sight before shipment. Other payment way can be
negotiated.
4. Delivery Time: 30 working days after PI/drawing/ prepayment
confirmed.
5. Package: Normally wrapped by plastic bags or burlap cloth at the
top and bottom, or according to clients’ requirement.
Company Introduce:
![]() |